Dawson Co-op Storage Building
Bear Mountain Construction
Arctech Welding + Machining supplied the structural steel required for the new storage building at Dawson Creek in North Eastern BC. This project was being completed for Bear Mountain Construction. The project consisted of the supply of engineered shop details and field erection drawings as well as the fabrication and surface coating of all steelwork required for the new building. There was approxiametly 12,660lbs of steel used.
Upon completion of the steel fabrication Arctech Welding + Machining was called upon to provide on site welding support during the erection stage.